1. Visual inspection (walk-through)
2. Review of engineering data
i. Design and construction document
ii. Operation and maintenance record
iii. Concrete (including materials used) records
iv. Periodic inspection report
3. Condition survey
i. Mapping of the various deficiencies
ii. Monitoring
iii. Joints survey
iv. Sampling and testing
v. Nondestructive testing
vi. Structural analysis
4. Final evaluation
5. Condition survey report
No comments:
Post a Comment